Skip to main content Skip to main navigation menu Skip to site footer
Jurnal HPJI (Himpunan Pengembangan Jalan Indonesia)
  • Current
  • Archives
  • About
    • About the Journal
    • Announcements
    • Author Guidelines
    • Author Index
    • Contact
    • Editorial Team
    • publication ethics
    • Reviewer
    • Submissions
    • Privacy Statement
Search
  • Register
  • Login
  1. Home /
  2. Archives /
  3. Vol. 4 No. 2 (2018)

Vol. 4 No. 2 (2018)

					View Vol. 4 No. 2 (2018)
Published: 2018-10-02

Articles

  • STANDARD OPERATING PROCEDURES OF THE INTEGRATED DESIGN AND BUILD TOLL ROAD CONSTRUCTION IN INDONESIA

    Slamet Muljono, Hardy P. Siahaan
    77-90
    • PDF
  • PENGARUH PENGGUNAAN PASIR KUARSA PADA LASTON AC-WC SEBAGAI PENGGANTI AGREGAT HALUS

    Gayuh Bintang Ramadhan, Latif Budi Suparma
    91-104
    • PDF
  • PENILAIAN USAHA KE ARAH TRANSPORTASI BERKELANJUTAN BERDASARKAN STARS v.2.1 DI INSTITUT TEKNOLOGI NASIONAL

    Mia Wimala, Muhammad Iqbal, Andrean Maulana
    105-116
    • PDF
  • PELAKSANAAN PERMUKAAN PERKERASAN BLOK BETON TERKUNCI DI ATAS LAPIS PENDUKUNG FLEKSIBEL

    Greece Maria Lawalata, Heddy R. Agah
    117-128
    • PDF
  • SISTEM MANAJEMEN MUTU PENGAWASAN PEKERJAAN LAPIS PEREKAT JALAN PROVINSI DI PROVINSI KEPULAUAN RIAU

    Suji Hartanto, Agus Taufik Mulyono
    129-138
    • PDF
  • TEGANGAN PADA TANAH DASAR PERKERASAN DI LAPANGAN PENUMPUKAN PETI KEMAS PELABUHAN TRISAKTI BANJARMASIN

    Tilaka Wasanta, Prayoga Luthfil Hadi
    139-148
    • PDF
  • FUNCTIONAL PERFORMANCE ASSESSMENT AND METHOD DEVELOPMENT OF FLEXIBLE ROAD PAVEMENT IN INDONESIA NATIONAL ROAD

    Purwaningtyas Widya Hapsari, Imam Muthohar, Latif Budi Suparma
    149-160
    • PDF

Developed By

Open Journal Systems

Language

  • English
More information about the publishing system, Platform and Workflow by OJS/PKP.