Perancangan Lean Manufacturing dengan Menggunakan Waste Assessment Model (WAM) dan VALSAT untuk Meminimumkan Waste (Studi Kasus: PT. XYZ)

Authors

  • Tamzil Satria ITATS

DOI:

https://doi.org/10.26593/jrsi.v7i1.2828.55-63

Abstract

As an industrial company, XYZ Ltd. engaged in beverages should pay attention to the detailed processes of each line of its production. This aims to minimize potential problems which may occur that can cause losses. This research aimed to minimize waste on the production floor by designing  lean manufacturing. Lean manufacturing is an approach that tries to eliminate waste that occurs in the value stream. The method used is Waste Assessment Model (WAM) that functions to identify waste in tea  production, and Value Stream Analysis Tools (VALSAT) which functions to select mappingtools used, based on WAM result. From the research result, it was found out  that the production time of original tea 450 ml took 20,255.4 seconds and the total lead time of product fulfillment for delivery to customers took 13.23 days. The average reject product was 0.65%, exceeding the company maximum standard. Based on the mapping, recommendation for improvement was  given to minimize waste, among others the elimination of Non Value Added (NVA) activity, the application of forecasting, and preventive maintenance activities. This research resulted in the waste identification, which  the biggest waste in this company was defect, decreasing the lead time of production time to become 14,767,4 second faster and Process Cycle Efficiency (PCE) which was increased from 39,12% to 53,66%.

References

Anugrah, M., Zaini, E., dan Rispianda. (2016). Usulan Pengurangan Waste Proses Produksi Menggunakan Waste Assessment dan Value Stream Mapping Di PT. X. Jurusan Teknik Industri – Institut Teknologi Nasional Bandung.

Daonil. (2012). Implementasi Lean Manufacturing untuk Eliminasi Waste pada Lini Produksi Machining Cast Wheel dengan Menggunakan Metode WAM dan VALSAT. Magister Teknik - Universitas Indonesia (UI) Depok.

Gaspersz, V. (2008). Lean Six Sigma. Jakarta : PT Gramedia Pustaka Utama.

Gaspersz, V. (2011). Lean Six Sigma for Manufacturing and Service Industries. Jakarta: Gramedia Pustaka Utama.

Hines, P., and N. Rich, (1997). The Seven Value Stream Mapping Tools. International Journal of Operations & Production Management.

Hines, P. and Taylor, D. (2000).”Going Lean, Lean Enterprise Research Center”. Cardiff Bussiness School, USA.

Hines, P., and N., Rich. (2004). Learning to envolve: A Review of Contempory Lean Thinking. International Journal of Operational and Production Management, 24, 994-1012.

Khannan, Muhammad S. A, dan Haryono. (2015). Analisis Penerapan Lean Manufacturing untuk Menghilangkan Pemborosan di Lini Produksi PT. Adi Satria Abadi. Jurnal Teknik Industri, Universitas Pembangunan Nasional Veteran.

Rawabdeh, Ibrahim, A. (2005). A Model for Assessment of Waste in Job Shop Environments. International Journal Of Operations & Production Management, Vol.25 Iss:8, pp.800 – 822.

Trisnawati, Novi, Bahauddin, N., Ekawati, R. 2013. Rancangan Perbaikan Pelayanan Puskesmas dengan Pendekatan Lean Healthcare dan Simulasi. Jurnal Teknik Industri, Universitas Sultan Ageng Tirtayasa.

Downloads

Published

2018-04-30