https://doi.org/10.26593/jrsi.v11i2.5005.121-128Keywords:
Facility layout, Systematic Layout Planning, Blocplan, material handlingAbstract
PD Ayam Ras is a food industry that processes coffee beans into ground coffee ready for brewing. The problems that arise in PD Ayam Ras are caused by unplanned layout design between departments, inefficient material transfer distances and costs material handling that have not been calculated. This causes departments that have closely related material flow sequences to be located far apart. In addition, there is backflow (backtracking) resulting in movement back and forth in the production process. PD Ayam Ras still has empty space that has not been utilized so that space utilization is not optimal resulting in inefficient material flow in the coffee powder production process, thus increasing distance and costs material handling. The purpose of this research was to determine the initial layout of the PD Ayam Ras, analyze the layout of PD Ayam Ras factory based on material handling distances, material handling costs and inter-departmental linkages and produce a proposed layout design for PD Ayam Ras .The method used to redesign the facility layout in PD Ayam Ras factory is Systematic Layout Planning (SLP ) method with the help of Blocplan software. The results of the study obtained an efficiency of 36.02 % with costs material handling of Rp. 540,559.40 per day.
References
Abdurrahman, M. M., Kastaman, R., & Pujianto, T. (2021). Perancang Ulang Tata Letak Fasilitas Produksi untuk Efisiensi Produksi Kopi di PT Sinar Mayang Lestari Menggunakan Metode Systematic Layout Planning dan Software Blocplan. Jurnal Agrikultura, 32(2), 146-157.
Apple J. M. (1990). Tata Letak Pabrik dan Pemindahan Bahan. Edisi ketiga. ITB, Bandung.
Azkiya, M. A., Iqbal, M., & Puspita. A. I. (2014). Perancangan Usulan Tata Letak Fasilitas Pembuatan Meeting Chair pada Departemen Konstruksi PT Chitose Indonesia Manufacturing dengan Pendekatan Group Technology dan Algoritma Blocplan Untuk Meminimasi Momen Perpindahan. Jurnal Rekayasa Sistem dan Industri, 1(1), 37-42.
Damanik. P. Y. D. (2014). Perencanaan Ulang Tata Letak Fasilitas Produksi Teh Hitam (CTC) Menggunakan Algoritma Craft (Studi Kasus di PT Perkebunan Nusantara XII (PERSERO) Bantaran Blitar. Skripsi. Fakultas Teknologi Pertanian Universitas Brawijaya. Malang.
Daya, A.M., Setania, D.F., & Profita, A. (2018). Perancangan Ulang Tata Letak Fasilitas Produksi Dengan Metode BLOCPLAN (Studi Kasus: UKM Roti Rizki, Bontang). Performa: Media Ilmiah Teknik Industri, 17(2), 140-145.
Jaya, D.J., Nuryati, & Audinawati, N. A. S. (2017). Perancangan Ulang Tata Letak Fasilitas Produksi UD. Usaha Berkah Berdasarkan Activity Relationship Chart (ARC) dengan Aplikasi Blocplan 90. Jurnal Teknologi Agro-Industri, 4(20), 111-123.
Muslim, D., & Ilmaniati, A. (2018). Usulan Perbaikan Tata Letak Fasilitas Terhadap Optimalisasi Jarak dan Ongkos Material Handling dengan Pendekatan Systematic Layout Planning (SLP) di PT Transplant Indonesia. Jurnal Media Teknik & Sistem Industri, 2(1), 45-52.
Nurhasanah, N., & Simawang, P. B. (2013). Perbaikan Rancangan Tata Letak Lantai Produksi di CV. XYZ. Jurnal Al-Azhar Indonesia Seri Sains dan Teknologi, 2(2), 81- 90.
Pratiwi, I., Muslimah, E., & Aqil, W. A. (2012). Perancangan Tata Letak Fasilitas di Industri Tahu Menggunakan Blocplan. Jurnal Ilmiah Teknik Industri, 11, 102-112.
Purnomo, H. (2004). Perencanaan dan Perancangan Fasilitas. Graha Ilmu. Yogyakarta.
Oktiarso, T., & Loekito, H. S .(2017). Perancangan Ulang Tata Letak Area Produksi PT X dengan Metode Systematic Plant Layout. Prosiding Seminar Nasional Inovasi dan Aplikasi Teknologi di Industri 2017. ITN, Malang.
Wahyudi, S. E. (2010). Perancangan Ulang Tata Letak Fasilitas Produksi di CV Dimas Rotan Gatak Sukoharjo. Skripsi. Fakultas Teknik. Universitas Sebelas Maret, Surakarta.
Wignjosoebroto, S. (2009). Tata Letak Pabrik dan Pemindahan Bahan. Edisi ketiga. Guna Widya, Surabaya.